On a 7,000 Sqm plot, the company is constructing phase B of the project, in cooperation with Delek Motors.
The project includes two 42-story towers, with a total area of 100,000 Sqm, on top of an 8-floor underground parking, with 1,350 parking spaces.
The Eastern Tower, on Ayalon Highway, with an area of 60,000 Sqm, was sold in its entirety to Bank Hapoalim and will be occupied upon completion as the Bank’s headquarters.
The Western Tower, on Haharash St., is a mixed-use building, a commercial ground floor, topped by offices, a hotel, and 130 residential units in the top 22 floors in an area of about 48,000 square meters.
Alongside the tower, two rhythmic gymnastics’ sports halls will be constructed, as a public service for the Tel Aviv Municipality.
Project completion is expected during 2025.
Holding: the company’s share in the project – 50%